2019/08/22

UK NG power outage 2019-08-09 - [2]

An interim report [Interim Report into the Low Frequency Demand Disconnection (LFDD) following Generator Trips and Frequency Excursion on 9 Aug 2019] has been made by the National Grid concerning the events leading to the power outage. The documents tend to disappears here is the frequency/time plot from the document:


Of interest is the fact that after the initial failures at Hornsea and one of the turbines at Little Barford the system begins to recover. Then another 2 of the Little Barford generators is manually removed because of steam overpressure.
It is at this point the system crashes out and load is shed.

Additional reports [links added 2020]


https://www.ofgem.gov.uk/system/files/docs/2019/09/eso_technical_report_-_appendices_-_final.pdf

https://www.ofgem.gov.uk/system/files/docs/2019/09/eso_technical_report_-_final.pdf

2019/08/17

UK power outage August 2019

Suggestions have been made that adding  wind energy to the UK national grid has increased the frequency variability.

By looking at the Gridwatch data for frequency it is possible to see the frequency variation at a 5 minute sample rate.

I have plotted the  frequency for 2012 to 2019 looking at the rolling
 [50 minute max]-[50 minute min]
data.

This shows an insignificant change over the 7 years:


However looking at frequency deviations above 0.5Hz there were none before 2005 but 6 after 2005.

Also looking at the overall plot there appears to have been an improvement in frequency stability at March 2014. If this is true then the plot does show a worsening of frequency stability from 2014 until about 2017

Since 2017 there has been insignificant change.


2019/08/10

UK NG power outage on 2019-08-09

Some interesting stuff from gridwatch.

Claim from the National Grid is that power outage caused by Little Barford and Hornsea wind disconnecting from grid.

In May 2008 similar happened:
htTps://www.ofgem.gov.uk/ofgem-publications/41426/nationalgrid-systemeventsof27mayfordswg16july.pdf
except 2 stations (Longannet and Sizewell)  tripped which gave a loss of 1582MW and then other back up systems failed.
the outage ended after 7 hours


Little Barford Power Station is a 740 MWe gas-fired power station
Hornsea Wind Farm maximum is 1.2GW
1.5 GW maximum lost according to gridwatch and they have learned nothing since 2008.

and of course even more people affected


What is interesting is that Gridwatch shows that the frequency dropped nearly 20 minutes before the two stations went offline. Grid watch is updated every 5 minutes so should have shown a intantataneos frequency and power loss.
 The frequency changes as a result of overload on the grid.

Did the stations drop because of frequency drop or did the frequency drop because the stations went offline? Or is it a reporting issue?

If the fast reserve cannot handle 1.8GW going offline simultaneously how do they expect to handle Hinkley C  with 2 reactors of 1.6GW?

PS
Many suggest that the variability of the wind is to be blamed. But if you look at the power levels during that day there was adequate capacity.
There was 8GW of spare CCGT power at the time of the outage. There was a demand 2.8GW below peak of the previous day. There was no drop or increase in wind strength. Simply put a gas power station tripped and a fault occurred on the transmission lines from the wind farm causing 0.9GW loss of supply.



2014/01/12

UK National grid - Rate of Change of Power

One of the many (usually spurious) reasons people give for not installing wind power is that the grid will have to run warm start and spinning reserve (see http://climateandstuff.blogspot.co.uk/2011/05/national-grids-reserves.html ) to cover the sudden loss of wind power.
This power generation is expensive.

The website http://www.gridwatch.templar.co.uk/ connects to a download of national grid status at 5 minute intervals.

I have analysed the data - calculating the slope of power over 3 adjacent data points (15 minute interval) for each available data point. If any of the three data points is zero then no data is plotted.

There are some oddities these have been plotted but the point is allowed off scale to keep valid data to be on a sensible scale:

The plot colour indicates a different vertical scale. (scales have been corrected)


15 days of service

Over 2 days this looks like:
2 days of service

It looks as if wind can vary by as much as 15MW / minute
But this compares with demand which can vary by 170MW/minute

Closing in on a few hours shows:
6 hours - Coal replaces Nuclear

It is interesting to note that at 17 hours 10 minutes it appears as if wind is used for balancing - all fast reaction generators and wind show a drop.

It is also significant that there is little impact of wind variation showing on the fast reactor generators.

Finally Wind output shown over the same few hours:
Wind power output added








2013/11/27

French Nuclear Plants Have Problems

French electricity imports rise as cold spell dampens nuclear outputLondon (Platts)--26Nov2013/811 am EST/1311 GMT French net power imports slumped early Tuesday after EDF suffered an unplanned outage at its 900 MW Fessenheim 2 nuclear power reactor and demand rose on colder weather, the latest data from grid operator RTE showed.

The Fessenheim 2 reactor was taken off the grid at 04:00 local time Tuesday (0300 GMT), and no restart date was given.

The outage follows capacity limitations at several other EDF reactors, including the 900 MW Chinon 1 and Gravelines 2 reactors.

Lower temperatures increased French power demand by 2.3 GW on the day to 75.0 GW at 08:45 Tuesday and national power imports climbed from 500 MW Monday to almost 3 GW Tuesday


 
 
2013-12-14 And still the French purchase our power:

And its not just during peak demand. There seems to be something amiss with the French grid. The interconnector power must be more expensive then home grown electricity. So why do they not bring their reserves on line??
Back to normal?


The Interconnector is now fixed and UK is again buying 2GW from the French!


The wind generation is now at least 6GW (windy!) and possibly as high as 9GW (some generation is not recorded on grid (used locally)

http://www.gridwatch.templar.co.uk/

So UK was supplying up to 2GW to the French power grid. Another example of a complex system working.
However it is surprising that the French do not increase the output of their cheap(???) nuclear stations instead of buying from the UK. Perhaps they are having real problems with their system?

2013/10/30

The UK Storm of 28th October and the National Grid

The storm of 2013-10-28 managed to isolate a UK nuclear station from the National Grid leading to headlines such as:

Dungeness nuclear power station shuts down following hurricane-strength winds

St Jude’s UK storm forces the Dungeness B reactor in Kent to shut down for up to a week

The isolation from the grid means that essential systems controlling the reactor only have diesel generator backup and so for safety the reactor is shut down.
 
Just How is the loss of 1GW handled by the grid - the two plots that follow use data generated every 5 minutes (the dotted curves use the scale on the right of the plots all vertical scales are in MW):
 
 
 
Note that the bulk of the transient is compensated by pumped storage during the 1st 5 minutes (actually responds within 12 seconds) Hydro and coal and gas (CCGT) are also ramped up and pumped storage is reduced.  However at this time in the morning demand is rapidly increasing and coal and gas output cannot provide further rapid increase an so pumped supply is again increased,
 


 The plot shows data at 5 minute intervals so the immediacy of the Pumped storage is not visible.
 
 
It is also worth noting that the rarely used OCGT (inefficient gas) is brought online in case it is needed (only 50MW is utilised - past OCGT has provided up to 400MW).
 
So this aging reactor of approximately 1GW switching off is handled adequately by the system. In particular the instant response pumped storage.
 
The proposed Nuclear plant at Hinkley Point C will use 2 * 1.6GW reactors Losing one of these will equire spinning reserve (as provided by pumped storage and spinning turbines of other thermal stations)
 
Pumped storage:
 Each of Dinorwig's six generating units can produce 288MW of electricity, offering a combined station output of 1728MW.
Ffestiniog's four 90MW units have a combined generating capacity of 360MW.
 
I.e. a total of around 2GW. This will handle one of Hinkley's reactors but not both.
 

2012/08/17

The Reliabilty of Nuclear stations compared to Wind Power

Warm seawater forces Conn. nuclear plant shutdown
By Stephen Singer on August 13, 2012
HARTFORD, Conn. (AP) — Connecticut's nuclear power plant shut one of two units on Sunday because seawater used to cool down the plant is too warm.
Unit 2 of Millstone Power Station has occasionally shut for maintenance or other issues, but in its 37-year history it has never gone down due to excessively warm water, spokesman Ken Holt said on Monday.
Water from Long Island Sound is used to cool key components of the plant and is discharged back into the sound. The water cannot be warmer than 75 degrees and following the hottest July on record has been averaging 1.7 degrees above the limit, the Nuclear Regulatory Commission said.
The federal agency issued an "emergency license amendment" last week, allowing Millstone, a subsidiary of Dominion Resources Inc., to use an average temperature of several readings.
"It wasn't enough to prevent us from shutting down," Holt said.
================================

River temperature forces nuclear plant to 50 percent power


Not even TVA can beat the heat.
On Wednesday, the utility had to bring a third reactor at Browns Ferry Nuclear Plant down to 50 percent power to avoid environmental sanctions because the water in the Tennessee River — where the plant's cooling water is discharged — already was at 90 degrees.
"When the river's ambient temperature reaches 90 degrees, we can't add any heat to it," said TVA's nuclear spokesman Ray Golden.
Similar problems last summer forced the Tennessee Valley Authority to spent $50 million for replacement power, according to Golden. The extra expense translated to something between 50 cents and $1 on most electric bills several months later, officials have said.
To avoid similar heat problems this year, TVA in October began construction on a seventh cooling tower at Browns Ferry, which is near Athens, Ala., and officials expected the $80 million super tower to be complete in June or July.
But weather stormed that plan, too.
"It was delayed because of the impact of the tornadoes, and some spring storms and some heavy rains," Golden said. "It's probably about 98 percent complete, and we hope it will be in service in the next one to two months."

=================================
August 24, 2010 By
90 Degree River Shuts Down Southern Nuclear Plant
Blue Living Ideas

       As a result of the record high temperatures engulfing the South (and much of the planet) the Tennessee Valley Authority has had to shut down its largest nuclear power plant for the 40th day since  July 8th, the TimesFreePress reports. The Tennessee River in Alabama is just much too hot.

================================
Water shortages hit US power supply
As the United States' extended heat wave and drought threaten to raise global food prices, energy production is also feeling the pressure. Across the nation, power plants are becoming overheated and shutting down or running at lower capacity; drilling operations struggle to get the water they need, and crops that would become biofuel are withering.
While analysts say the US should survive this year without major blackouts, more frequent droughts and increased population size will continue to strain power generation in the future.
Power plants are a hidden casualty of droughts, says Barbara Carney of the National Energy Technology Laboratory (NETL) in Morgantown, West Virginia, because they are completely dependent on water for cooling and make up about half the water usage in the US. That makes them vulnerable in a heat wave. If water levels in the rivers that cool them drop too low, the power plant – already overworked from the heat – won't be able to draw in enough water. In addition, if the cooling water discharged from a plant raises already-hot river temperatures above certain thresholds, environmental regulations require the plant to shut down.
At least four nuclear plants had to shut down in July for these reasons. Nationwide, nuclear generation is at its lowest in a decade, with the plants operating at only 93 per cent of capacity.
Nuclear is the thirstiest power source. According to NETL, the average nuclear plant that generates 12.2 million megawatt hours of electricity requires far more water to cool its turbines than other power plants. Nuclear plants need 2725 litres of water per megawatt hour for cooling. Coal or natural gas plants need, on average, only 1890 and 719 litres respectively to produce the same amount of energy.
==============================
http://www.nytimes.com/2007/05/20/health/20iht-nuke.1.5788480.html?pagewanted=all
Officials at Électricité de France have been preparing for a possible rerun of a ferocious heat wave that struck during 2003, the hottest summer on record in France, when temperatures of some rivers rose sharply and a number of reactors had to curtail output or shut down altogether.
The French company operates 58 reactors - the majority on ecologically sensitive rivers like the Loire.
During the extreme heat of 2003 in France, 17 nuclear reactors operated at reduced capacity or were turned off. Électricité de France was forced to buy power from neighboring countries on the open market, where demand drove the price of a megawatt hour as high as €1,000, or $1,350. Average prices in France during summer months ordinarily are about €95 per megawatt hour.
The heat wave cost Électricité de France an extra €300 million. The state-owned company "swallowed it as a one-off cost of doing business in extreme circumstances," Philippe Huet, an executive vice president at Électricité de France, said.
===============================

So Just like wind, nuclear has to shut down when needed most.

OK so how about wind requiring all that backup running continuously in case the wind drops?

Well, one scram on a nuclear plant will require the generation of 500MW to 1GW of instantly available power (spinning reserve) - you cannot  allow supply interruption (May 2008 outage National Grid).
Wind does not fail instantly everywhere so a gradual decrease in power has to be compensated by conventional. In general, most stations running under warm start conditions will be producing the required power when needed. There is probably no need for spinning reserve as wind backup - the met office seem reasonably accurate predicting a few hours ahead).

lets look at UK National Grid data for a few days:
10th August to 17th Agust 2012 data



Note that the peak delivered is 15GW greater than the lowest delivered. The National Grid may not like this normal situation but the certainly find no difficulty providing the power.

It would therefore seem obvious that at least 15GW of solar and wind could be accomodated. (solar of course would remove some of the daily peak).

From an earlier post here:
National grids reserves
From wiki
There is generally about 1.5 GW of so called spinning reserve
NG pays to have up to 8.5 GW of additional capacity available to start immediately but not running, referred to as warming or hot standby, that is ready to be used at short notice which could take half an hour to 2 hours to bring on line
A similar amount of power stations (8–10 GW by capacity) are operable from a cold start in about 12 hours for coal burning stations, and 2 hours for gas fired stations


Short term and instantaneous load and generation response mechanisms

The national grid is organized, and power stations distributed, in such a way as to cope with sudden, unforeseen and dramatic changes in either load or generation. It is designed to cope with the simultaneous or nearly simultaneous failure of 2 × 660 MW sets
Spinning Reserve National Grid pays to keep a number of large power station generators partly loaded.
Pumped Storage Pumped storage as in Dinorwig Power Station is also used in addition to spinning reserve to keep the system in balance.

Frequency Service For large perturbations, which can exceed the capability of spinning reserve, NG (National Grid plc) who operate the national grid and control the operations of power stations (but does not own them) has a number of partners who are known as NG Frequency Service, National Grid Reserve Service or reserve service participants. These are large power users such as steel works, cold stores, etc. who are happy to enter into a contract to be paid to be automatically disconnected from power supplies whenever grid frequency starts to fall.
Standing Reserve Operating closely with NG Frequency Response is the National Grid Reserve Service now called STOR or Short Term Operating Reserve.[9] NG Standing Reserve participants are small diesel engine owners, and Open Cycle gas turbine generator owners, who are paid to start up and connect to the grid within 20 minutes from the time Frequency Response customers are called to disconnect. These participants must be reliable and able to stay on and run for an hour or so, with a repetition rate of 20 hours.

National Grid has about 500 MW of diesel generators on contract, and 150 MW of gas turbines with about 2,000 MW of disconnect-able load.[9]

Sources of intermittency on the UK National Grid The largest source of intermittency on the UK National Grid is the power stations; in fact, the single largest source is Sizewell B nuclear power station. Whenever Sizewell B is operating the entire 1.3 GW output is liable to stop at any time without warning. Its capacity is 2.16% of the national grid maximum demand, making it the single largest power source and therefore the largest source of intermittency. Despite this issue, NG readily copes with it using the methods outlined above including the use of diesel engines. An industry-wide rate of unplanned scrams (shutdowns) of 0.6 per 7000 hours critical means that such a shut-down without warning is expected to happen about once every year and a half.[11] However, no matter how low the rate of unplanned scrams, this is largely irrelevant - what matters is the fact that it can and does happen, and measures have to be in place to deal with it.

In 2008 both Sizewell and Longannet power stations both stopped unexpectedly within minutes of each other, in fact causing widespread power failures, as substations were tripped off using prearranged under-frequency relays.[12]

Reports of May 2008 outage
National grid https://www.ofgem.gov.uk/ofgem-publications/41426/nationalgrid-systemeventsof27mayfordswg16july.pdf

https://web.archive.org/web/20100206093023/http://nationalgrid.com/NR/rdonlyres/E19B4740-C056-4795-A567-91725ECF799B/32165/PublicFrequencyDeviationReport.pdf


So what about all those rare earth magnets required in wind turbines and of course there is all that noise from gears being tortured? And wont they make the network more unreliable?

Well not all turbines are created equal

Take a look at:


ENERCON WECs produce clean energy without neodymium
29.04. 2011

ENERCON wind energy converters (WECs) generate electricity in an environmentally friendly way without the use of the controversial element, neodymium. The gearless WEC design on which all WEC types – from the E-33/330 kW to the E-126/7.5 MW – are based includes a separately excited annular generator. The magnetic fields required by the generator to produce electricity are created electrically. By design, and unlike the majority of competing products, ENERCON WECs do without permanent magnets whose production requires neodymium.

Neodymium has made the headlines recently because its extraction partly involves significant environmental damage. China, where neodymium-containing rocks are quarried in mines, is the main supplier of this so-called rare earth element. According to investigations by Germany’s NDR TV station, separation of neodymium from mined rocks results in toxic waste products (Menschen und Schlagzeilen and Panorama television magazines aired on 27 and 28 April). In addition, radioactive uranium and thorium are released by the mining process. These substances find their way into the ground water, heavily contaminating plant and animal life. They are seen as harmful to humans. According to the reports, part of the locals at the neodymium production sites in Baotou in northern China are already seriously ill.

ENERCON feels that these environmental and health aspects support its choice of WEC design. “We are a high-tech company that sets great store by environmental protection,” says ENERCON Managing Director Hans-Dieter Kettwig. “Our choice to rely on separately excited generators was the right one, not only from a technological but also from an environmental point of view.” According to Kettwig, renewable energies need to be viewed in their entirety in order to offer a convincing alternative. Producing clean energy is one thing; however, sustainability in production is just as important.
Helps the network recover:
Staying connected when grid problems occurMost transmission networks and ever more distribution grids require wind energy converters to remain connected to the grid in the event of grid short circuits. Like conventional power plants, wind turbines are not allowed to suddenly disconnect from the grid during voltage dips or overvoltage caused by grid problems. ENERCON wind turbines with the optional ENERCON UVRT feature have this capacity. No matter what type of short circuit occurs, ENERCON wind turbines can ‘ride through’ faults for several seconds, even if they were operating at rated power before the fault. This is also possible if the wind turbine voltage completely breaks down as a result of a power system failure. These outstanding power plant properties have been certified by independent institutes during actual grid fault testing. Flexible setting options offer maximum performance according to the respective grid operator’s specifications or to the project’s framework conditions.
Depending on the selected parameters, the wind turbine can feed in either mainly active or reactive power to maintain grid voltage. If necessary, voltage-dependent reactive current can even be supplied to the grid; this current can be maximum rated current as stipulated by the latest German grid code. If desired or required, fault ride-through is also possible without power feed-in. The ENERCON wind turbine remains in operation during the fault. After the grid problem has been resolved and grid voltage has been restored, the wind turbine can immediately resume power feed-in. Thus the ENERCON Undervoltage Ride-Through feature facilitates adaptable settings in order to meet grid standards (e. g. of the German
Association of Energy and Water Industries) and to maximise the amount of installable wind farm power.






2012/05/20

Wind and the price of electricity in UK

From a post at wuwt  (EU violates Aarhus Convention in ‘20% renewable energy by 2020’ program) :

Mark Duchamp, Executive Director of EPAW, points that Mr. Swords initiated his recourse one and a half years ago, as it was already obvious that the European Commission was imposing an enormously costly and ineffective policy to EU Members States without properly investigating the pros and cons. “It is high time that Brussels be held accountable for the hundreds of billions that have been squandered without a reality check on policy effectiveness” says Mark. “To spend so much money, a positive has to be proven. – It hasn’t.”
He [Pat Swords] continues: “Electricity costs are soaring to implement these dysfunctional policies, which have by-passed proper and legally-required technical, economic and environmental assessments. Not only is the landscape being scarred as thousands of wind farms are being installed, but people in the vicinity are suffering health impacts from low frequency noise, while birdlife and other wildlife is also adversely impacted. It is long overdue that a STOP was put to this type of illegal and dysfunctional policy development and project planning.”

So just how has windpower affected the UK electricity prices. Presumably if Swords is correct then the price of electricity will have increased at a greater rate than the fuel used to generate it. With words like "soaring" used these differences must be substantial.

Looking at data from http://www.decc.gov.uk/assets/decc/statistics/source/prices/qep213.xls you get this graph.



Interesting! Less of a soaring price than gas or coal
So is this just another distortion from the watts crowd?

If windpower were a driving factor then perhaps the energy cost will appear as a bigger budget item in the countries with higher windpower generation.
So let's have a look at germany:
compared to UK
compared to Denmark

So with UK having the lowest penetration of windpower of the three it also has the biggest Utilities cost (this of course includes a number of utilities not just electricity.


How about Cradle to grave costs. Here is the build / working breakdown of costs over 20 years:
Project: Single wind turbine (800kw)
Location: Balloo Wood, Bangor, Co. Down, Northern Ireland
Turbine: 800kw Enercon E48
Dimensions: 56m hub height, 24m blade length, 80m overall height
NGR: 350760E 379503N (lat 54.6411N, long 5.6656W)
Status: Operational


build £        889,650.00 install
planning etc £        434,583.00 install
maintenance0.0055perkwh
maintenance/year for delivered 280kwh £             562.49 per year
routine expenses £         30,000.00 per year
rating1000kwh
load factor28%
deliverd energy280kwh
Balancing Cost £               0.014 per kWh
Short term Reserve £               0.007 per kWh
total install cost= £     1,324,233.00
install cost/delivered kwh £           4,729.40
conventional backup costs/year £         51,544.08 per 280 kWh/year
running cost/year £         82,106.57 per 280 kWh/year
over n years25
total install over 25 yrs £     1,324,233.00
running cost over 25 yrs £     2,052,664.13
total cost over 25 yrs £     3,376,897.13
decomissioning cost (guess=.5*build) £        444,825.00
total cradle to grave cost £     3,821,722.13
energy generated over 25 yrs61362000kWh
cost per kwh over 25 yrs £               0.062 per kWh


most data from
http://silverford.com/blog/?p=1689/
This seems a reasonable figure but the decommissioning costs are pure guess work. The life time of most wind turbines is believed to be 25 years. The warranty period is 12years for this turbine.

A closer look at Germany/france:
For example:

Germany 2012 Note price Note Double peak

Germany 2012 Note price note single peak at peak volume

 PV electricity produced in Germany
check PV produced on Germany on daily basis from 2010


How about nuclear??




2011/05/21

Enercon Wind turbines and wind speed

False statements are often made about wind turbines (very narrow range of speed over which power is produced; large turbines shut down at lower wind speeds; rare earths costing the earth.)

From the Enercon brochure:

ENERCON storm control
ENERCON wind turbines run with a special storm control feature.
Storm control enables reduced wind turbine operation in the event of
extremely high wind speeds, and prevents typical shutdowns which
cause considerable yield losses.


 

Power curve without ENERCON storm control
Illustration 1 shows that the wind turbine stops at a defined cutout wind speed V3. The reason is that a specified maximum wind speed has been exceeded. In wind turbines without storm control, this occurs, for example, at a wind speed of 25 m/s within a 20-second mean. The wind turbine only starts up again when the average wind speed drops below the cut-out wind speed or an even lower restart speed (V4 in the illustration; so-called strong wind hysteresis). In gusty wind conditions there may be a longer delay, which means that considerable yield losses are incurred.
Power curve with ENERCON storm control
The power curve diagram showing operation with ENERCON storm control (illustration 2) demonstrates clearly that the wind turbine does not shut down automatically when a certain wind speed Vstorm is exceeded, but merely reduces power output by slowing down the rotational speed. This is achieved by slightly pitching the rotor blades out of the wind. Once the wind speed drops, the blades turn back into the wind and the turbine immediately resumes operation at full power. This prevents yield-reducing shutdown and start-up procedures.



Data for a 7.5MW wind turbine Enercon E126




As can be seen from the plot and data useful power is available from 4 to 25 m/s


Enercon Control systems being electronic can synchronise to grid quickly and can even help the grid ride out a system fault.

NO Rare earths are required for the generator

NO gears are required for the main shaft of the generator







Staying connected when grid problems occur
Most transmission networks and ever more distribution grids require wind energy converters to remain connected to the grid in the event of grid short circuits. Like conventional power plants, wind turbines are not allowed to suddenly disconnect from the grid during voltage dips or overvoltage caused by grid problems. ENERCON wind turbines with the optional ENERCON UVRT feature have this capacity. No matter what type of short circuit occurs, ENERCON wind turbines can ‘ride through’ faults for several seconds, even if they were operating at rated power before the fault. This is also possible if the wind turbine voltage completely breaks down as a result of a power system failure. These outstanding power plant properties have been certified by independent institutes during actual grid fault testing. Flexible setting options offer maximum performance according to the respective grid operator’s specifications or to the project’s framework conditions.
Depending on the selected parameters, the wind turbine can feed in either mainly active or reactive power to maintain grid voltage. If necessary, voltage-dependent reactive current can even be supplied to the grid; this current can be maximum rated current as stipulated by the latest German grid code. If desired or required, fault ride-through is also possible without power feed-in. The ENERCON wind turbine remains in operation during the fault. After the grid problem has been resolved and grid voltage has been restored, the wind turbine can immediately resume power feed-in. Thus the ENERCON Undervoltage Ride-Through feature facilitates adaptable settings in order to meet grid standards (e. g. of the German
Association of Energy and Water Industries) and to maximise the amount of installable wind farm power.

ENERCON news



ENERCON WECs produce clean energy without neodymium

29.04. 2011

ENERCON wind energy converters (WECs) generate electricity in an environmentally friendly way without the use of the controversial element, neodymium. The gearless WEC design on which all WEC types – from the E-33/330 kW to the E-126/7.5 MW – are based includes a separately excited annular generator. The magnetic fields required by the generator to produce electricity are created electrically. By design, and unlike the majority of competing products, ENERCON WECs do without permanent magnets whose production requires neodymium.

Neodymium has made the headlines recently because its extraction partly involves significant environmental damage. China, where neodymium-containing rocks are quarried in mines, is the main supplier of this so-called rare earth element. According to investigations by Germany’s NDR TV station, separation of neodymium from mined rocks results in toxic waste products (Menschen und Schlagzeilen and Panorama television magazines aired on 27 and 28 April). In addition, radioactive uranium and thorium are released by the mining process. These substances find their way into the ground water, heavily contaminating plant and animal life. They are seen as harmful to humans. According to the reports, part of the locals at the neodymium production sites in Baotou in northern China are already seriously ill.

ENERCON feels that these environmental and health aspects support its choice of WEC design. “We are a high-tech company that sets great store by environmental protection,” says ENERCON Managing Director Hans-Dieter Kettwig. “Our choice to rely on separately excited generators was the right one, not only from a technological but also from an environmental point of view.” According to Kettwig, renewable energies need to be viewed in their entirety in order to offer a convincing alternative. Producing clean energy is one thing; however, sustainability in production is just as important.

2011/05/03

Efficiency of power plant operating below capacity, start up times etc.

First a combined cycle gas turbine - not known for its efficiency at less than 100% of rated output.

http://www.gepower.com/prod_serv/products/tech_docs/en/downloads/ger3574g.pdf
Fast starting and loading is characteristic of STAG combined-cycle generation systems. This enables them to operate in mid-range, with daily start peaking service as well as baseload.

Typically, STAG systems can achieve full load within one hour during a hot start and within approximately three hours for a cold start.

Multi-shaft STAG systems allow the gas turbines to start independently of the steam cycle and provide about 65% of the plant capability within 15–25 minutes, depending on the size of the gas turbine, for hot, warm, and cold starts, as illustrated in Figure 36.Single-shaft STAG systems are started and loaded to full capacity in about the same time period as the multi-shaft STAG systems. The startup sequence and load profile for the single-shaft systems differ because the gas and steam turbines are started as a single integrated unit and not as two separate units. Single-shaft STAG startup is illustrated in Figure 37.







Now one designed for variable output

http://www.gepower.com/prod_serv/products/aero_turbines/en/downloads/lms100_brochure.pdf
The LMS100 is the Right Solution:
Outstanding full- and part-power efficiency
Low hot-day lapse rate
High availability – aero modular maintenance
Low maintenance cost
Designed for cycling applications
No cost penalty for starts and stops
Load-following capability
10 Minutes to full power
Improves average efficiency in cycling
Potential for spinning reserve credits
Reduced start-up emissions
Synchronous condenser capability





From the House Of Lords.

http://www.parliament.the-stationery-office.co.uk/pa/ld200708/ldselect/ldeconaf/195/19507.htm

101. The first cost imposed by intermittency is that more plant has to be held in reserve to cope with short-term fluctuations in output. At present, National Grid, which operates the electricity system,[34] keeps a number of power stations running at less than their full capacity, providing about 1 GW of spinning reserve—that is capacity which can automatically respond to any shortfall in generation within seconds (Q 293).[35] The company also contracts with other stations to start generation quickly and has arrangements with industrial consumers to reduce their demand at short notice, in order to restore the level of spinning reserves as soon as possible after they are used. The company holds about 2.5 GW of this standing reserve (Q 293); 70% of this comes from generation, and 30% from industrial consumers (p 144).

102. As the amount of wind generation rises, the potential short-term change in wind output will also increase, and National Grid will have to hold more reserve to cope with this increase. The company told us that if renewables provided 40% of electricity generation—the share the company believes would be needed to meet the EU's 2020 energy target—its total short-term reserve requirements would jump to between 7 and 10 GW. Most of this would be standing rather than spinning reserves. This would add £500 million to £1 billion to the annual cost of these reserves—known as balancing costs—which are now around £300 million a year (Q 293). This is equivalent to around 0.3 to 0.7 pence per kWh of renewable output.

103. Estimates of balancing costs vary widely. The government has commissioned research from the consultancy SKM,[36] which estimated that if renewables provided 34% of electricity by 2020, with 27.1% from wind power, the extra cost of short-term balancing would be about 1.4 p/kWh of wind output[37] (Q 481). This equates to a total cost of £1.4 billion, well above that assumed by National Grid. Several pieces of evidence cited a 2006 report by the UK Energy Research Centre (UKERC),[38] which had estimated the balancing costs with up to 20% of intermittent renewable output in Great Britain at 0.2-0.3 pence per kWh. Although the share of renewables in the SKM study was less than double that of UKERC, the balancing costs per unit were more than five times higher. In part, this may reflect higher fuel costs since the studies surveyed by UKERC were performed; but it will also reflect the greater challenges of dealing with larger shares of intermittent renewable generation.

So the costs of up to 20% wind is between £0.002 and £0.014 per kWh

The UK cost per kWh is approx £0.11

added 2011-11-24

2011/05/01

National grids reserves

From wiki
There is generally about 1.5 GW of so called spinning reserve
NG pays to have up to 8.5 GW of additional capacity available to start immediately but not running, referred to as warming or hot standby, that is ready to be used at short notice which could take half an hour to 2 hours to bring on line
A similar amount of power stations (8–10 GW by capacity) are operable from a cold start in about 12 hours for coal burning stations, and 2 hours for gas fired stations


Short term and instantaneous load and generation response mechanisms

The national grid is organized, and power stations distributed, in such a way as to cope with sudden, unforeseen and dramatic changes in either load or generation. It is designed to cope with the simultaneous or nearly simultaneous failure of 2 × 660 MW sets
Spinning Reserve National Grid pays to keep a number of large power station generators partly loaded.
Pumped Storage Pumped storage as in Dinorwig Power Station is also used in addition to spinning reserve to keep the system in balance.

Frequency Service For large perturbations, which can exceed the capability of spinning reserve, NG (National Grid plc) who operate the national grid and control the operations of power stations (but does not own them) has a number of partners who are known as NG Frequency Service, National Grid Reserve Service or reserve service participants. These are large power users such as steel works, cold stores, etc. who are happy to enter into a contract to be paid to be automatically disconnected from power supplies whenever grid frequency starts to fall.
Standing Reserve  Operating closely with NG Frequency Response is the National Grid Reserve Service now called STOR or Short Term Operating Reserve.[9] NG Standing Reserve participants are small diesel engine owners, and Open Cycle gas turbine generator owners, who are paid to start up and connect to the grid within 20 minutes from the time Frequency Response customers are called to disconnect. These participants must be reliable and able to stay on and run for an hour or so, with a repetition rate of 20 hours.

National Grid has about 500 MW of diesel generators on contract, and 150 MW of gas turbines with about 2,000 MW of disconnect-able load.[9]

Sources of intermittency on the UK National Grid The largest source of intermittency on the UK National Grid is the power stations; in fact, the single largest source is Sizewell B nuclear power station. Whenever Sizewell B is operating the entire 1.3 GW output is liable to stop at any time without warning. Its capacity is 2.16% of the national grid maximum demand, making it the single largest power source and therefore the largest source of intermittency. Despite this issue, NG readily copes with it using the methods outlined above including the use of diesel engines. An industry-wide rate of unplanned scrams (shutdowns) of 0.6 per 7000 hours critical means that such a shut-down without warning is expected to happen about once every year and a half.[11] However, no matter how low the rate of unplanned scrams, this is largely irrelevant - what matters is the fact that it can and does happen, and measures have to be in place to deal with it.

In 2008 both Sizewell and Longannet power stations both stopped unexpectedly within minutes of each other, in fact causing widespread power failures, as substations were tripped off using prearranged under-frequency relays.[12]

Reports of May 2008 outage
National grid http://www.nationalgrid.com/NR/rdonlyres/E19B4740-C056-4795-A567-91725ECF799B/32165/PublicFrequencyDeviationReport.pdf

Ofgem
http://www.ofgem.gov.uk/Markets/WhlMkts/CustandIndustry/DemSideWG/Documents1/National_Grid_-_System_Events_of_27_May_for_DSWG_16_July.pdf