Of interest is the fact that after the initial failures at Hornsea and one of the turbines at Little Barford the system begins to recover. Then another 2 of the Little Barford generators is manually removed because of steam overpressure.
It is at this point the system crashes out and load is shed.
Additional reports [links added 2020]
https://www.ofgem.gov.uk/system/files/docs/2019/09/eso_technical_report_-_appendices_-_final.pdf
https://www.ofgem.gov.uk/system/files/docs/2019/09/eso_technical_report_-_final.pdf